Client: Cameron Homes
Sector: Residential Development
Location: Dudley, West Midlands
Project overview
The Saltwells Lane site was earmarked for a new residential development by Cameron Homes. Due to the site’s location within an area affected by historic mining activity, a comprehensive ground investigation was essential to identify potential risks and ensure the site was safe for construction.
Our approach
GIP was appointed to carry out a detailed ground investigation to support the development’s planning and design phases. Our key services included:
- Site investigation and sampling – conducting boreholes, trial pits, and dynamic probing to assess the soil, rock, and groundwater conditions.
- Mining risk assessment – evaluating the site for historical mine workings, shafts, and potential ground instability associated with past coal mining.
- Laboratory testing – performing geotechnical and geo-environmental tests to determine soil strength, permeability, and contamination levels.
- Detailed reporting and recommendations – providing Cameron Homes with a comprehensive report outlining any risks and offering practical recommendations for foundation design and remediation measures.
Project challenges and solutions
The site’s history of coal mining presented a significant challenge, with the potential for voids, weak zones, and ground movement. Our thorough investigation identified the key risks early, enabling the design team to implement appropriate mitigation strategies and avoid delays.
Results
Our ground investigation provided Cameron Homes with the critical data they needed to progress confidently with their residential development. The proactive identification of risks and clear recommendations ensured a smooth planning process and helped create a safe, sustainable foundation for the new homes at Saltwells Lane.
Need expert support for your residential development? Contact us today to learn how our ground investigation services can help you build with confidence.